Opens in a new tab
All samples

Main contractor · Residential & commercial

We build whatthe drawings promise.

New builds, extensions and refurbishments, delivered by one site team with one programme you can read.

A steel frame going up on site
Wharf RoadTwelve apartments · Steel frame
On site now
  • 25Years building
  • 140+Projects handed over
  • 60People on our own payroll
  • 10Year structural warranty

Anatomy

What you are paying for, layer by layer.

  1. Layer 01 / 04

    Roof and envelope

    Weathertight first: roof, cladding, windows and insulation checked before any finish goes in.

  2. Layer 02 / 04

    Services

    Heating, power, water and data, coordinated on one drawing so nothing clashes behind the wall.

  3. Layer 03 / 04

    Structure

    Steel, timber or concrete, signed off by the engineer at every stage.

  4. Layer 04 / 04

    Foundations

    Site investigation, drainage and footings designed for the ground you actually have.

Refurbishment

The same room, eleven weeks apart.

Drag the divider.

The same room after refurbishment
The room before work started
Ground-floor refurbishment, shown from the same position.

Process

Six stages. One programme.

  1. Stage 01

    Survey

    Measure, test the ground, read the drawings.

    We visit, measure and flag anything the drawings do not show.

  2. Stage 02

    Price

    A fixed, itemised quote.

    Every trade priced separately, with provisional sums named as such.

  3. Stage 03

    Programme

    Week-by-week dates.

    A programme you can read, updated every Friday.

  4. Stage 04

    Build

    One site manager throughout.

    The same person on site every day, and one number to call.

  5. Stage 05

    Snag

    We find the faults first.

    Our own inspection before yours, and a signed-off list.

  6. Stage 06

    Hand over

    Keys, manuals, warranties.

    A handover file and a visit at twelve months.

What goes wrong on building projects?

You always know the date and the cost.

Reported weekly

What’s holding you back?

Delays

  1. FrictionDelaysThe finish date keeps moving and nobody says why.
  2. EvidenceFriday programme
  3. Decision outcomeNo surprises on dates

If a date moves, you hear the reason and the recovery plan the same week.

Extra costs

  1. FrictionExtra costsVariations appear on the final invoice.
  2. EvidenceSigned variations
  3. Decision outcomeThe invoice matches the quote

Every change is priced and signed before it is built.

Poor finish

  1. FrictionPoor finishSmall faults nobody comes back to fix.
  2. EvidenceSnag list
  3. Decision outcomeFinished means finished

Final payment is due only when the list is clear.

Drawings ready?

Request a quote.

Send us the drawings. You get an itemised price and a programme within ten working days.

Ferro Build

Sample landing page. Replace every name, figure and project with your own.